Projects/Concrete repair

A new chapter.
For an existing floor.

Lee Kong Chian Natural History Museum · Singapore

Exterior of the Lee Kong Chian Natural History Museum with its planted facade
ApplicationGallery floor repair
Material in reportInorganic repair adhesive
Observed crack widths1–5 mm at this site

Repair, at
floor level.

The report documents recurring cracks in cast concrete gallery floor slabs. The trial explored manual application of a fast-hardening inorganic adhesive to fill the existing cracks.

Repair adhesive being poured into a gallery floor crack
Application · Repeated filling of deeper cracks
Repaired gallery floor crack documented at inspection
Inspection · Repaired area recorded in the report
Reported early observation

Public access after
24 hours of curing.

The case study reports a hard repaired surface allowing public access at the next-day inspection. This is a site-specific early observation; the supplied report does not establish long-term durability or a universal reopening time.

What the trial taught.

Manual mixing and repeated filling were used. Surface finishing, such as polishing, can enhance the appearance of the repaired surface.

Discuss a repair