A new chapter.
For an existing floor.
Lee Kong Chian Natural History Museum · Singapore

ApplicationGallery floor repair
Material in reportInorganic repair adhesive
Observed crack widths1–5 mm at this site
Repair, at
floor level.
The report documents recurring cracks in cast concrete gallery floor slabs. The trial explored manual application of a fast-hardening inorganic adhesive to fill the existing cracks.


Reported early observationPublic access after
Public access after
24 hours of curing.
The case study reports a hard repaired surface allowing public access at the next-day inspection. This is a site-specific early observation; the supplied report does not establish long-term durability or a universal reopening time.
What the trial taught.
Manual mixing and repeated filling were used. Surface finishing, such as polishing, can enhance the appearance of the repaired surface.
Discuss a repair